installation

Installation with Treon Nut Adapter

Introduction It is possible to install your Treon Industrial Node and Industrial Node 6 either with or without epoxy. Option A: Nut adapter installation with epoxy:​ Minimum thread length can be less than 9 mm depending on the amount of epoxy​ Node alignment can be done manually​