beginner

Activating the Mesh Network

Introduction Before and after the deployment of a mesh network, it is important to test and troubleshoot common issues in deployment.  Testing the Network Before you install the physical devices at the deployment site, first perform a dry-run of the system to test if the network runs.

Activating the Mesh Network

Introduction Before and after the deployment of a mesh network, it is important to test and troubleshoot common issues in deployment.  Testing the Network Before you install the physical devices at the deployment site, first perform a dry-run of the system to test if the network runs.

Activating the Mesh Network

Introduction Before and after the deployment of a Wirepas mesh network, it is important to test and troubleshoot common issues in deployment.  Testing the network Before you install the Treon products at the deployment site, first perform a dry-run of the system to test if the network functions properly.

Mounting a sensor

The temperature and vibration sensors in the Treon Industrial Node C are located at the base of the device. Any part of the base can serve as a contact point, but for accurate readings, the contact area should be at least 30 x 25 mm.

Mounting a sensor

The temperature and vibration sensors in the Treon Industrial Node C are located at the base of the device. Any part of the base can serve as a contact point, but for accurate readings, the contact area should be at least 30 x 25 mm.

Network Connectivity

Network Connectivity

Network Connectivity

Getting Started with Treon Connect as Maintenance Technician

Getting Started with Treon Connect as Maintenance Technician